CENTOR supplies tail sealant grease and complete TBM lubrication packages to some of the largest-diameter shield drives currently underway in China — spanning urban road tunnels, a national water diversion scheme, and a twin-bore metro crossing beneath the Yangtze. On every one of these projects the machines operate at the edge of their design envelope: high water pressure, hard and abrasive strata, and excavation diameters above 12 m.
Contact us to discuss how CENTOR products and engineering support can be specified on your next underground project.