Project References

Proven on China's largest
shield tunnelling drives.

Tail sealant grease and full TBM lubrication support on metro, highway and national water diversion tunnels.

01Reference Overview

Large-Diameter Shield Tunnelling — China

CENTOR supplies tail sealant grease and complete TBM lubrication packages to some of the largest-diameter shield drives currently underway in China — spanning urban road tunnels, a national water diversion scheme, and a twin-bore metro crossing beneath the Yangtze. On every one of these projects the machines operate at the edge of their design envelope: high water pressure, hard and abrasive strata, and excavation diameters above 12 m.

3
Flagship Shield
Projects
≈ 25 km
Combined Drive
Length Supported
14.5 m
Largest Excavation
Diameter
100%
Tail Grease & TBM
Lubrication Scope
02The Projects

Three Flagship Shield Drives

Reliable Lubrication. Seamless Tunnelling.

Building Trust · Leading Tomorrow

Add Your Project to Our References

Contact us to discuss how CENTOR products and engineering support can be specified on your next underground project.